S. No. Name of Project Client Info. Assignment Cost of Project Start Date End Date
1Independent Engineer for 24 Border Check Post Project on BOT Basis in Madhya Pradesh – Jointly with Bloom LLC.Madhya Pradesh Road Development Corporation,Bhopal (M.P.)Independent Engineer ServicesRs. 1094 Crores31-Dec-1969Ongoing
2Consultancy for Operation and Maintenance of Haldia Port OMT – 17 (PC)National Highways Authority of India (NHAI)A, B, C, D31-Dec-1969Ongoing
3Consultancy for Operation and Maintenance for Srinagar Bypass (Road Portion) (NS – 30) Srinagar Bypass (Bridge Portion) (NH – 30 A) km 286 to km 303.8National Highways Authority of India (NHAI) OMT – 31 (NS)A, B, C, D31-Dec-1969Ongoing
4Consultancy for Lalitpur-Sagar-Lakhnadone Section of NH – 7 OMT – 14 (NS)National Highways Authority of India (NHAI)A, B, C, D31-Dec-1969Ongoing
5Lenders Engineer for Valuation of Machinery Borrower-M/s OPC Technology Japan Pvt. Ltd.Punjab National BankG31-Dec-1969Ongoing
6Lenders Independent Engineer for JAIPUR – BHILWARA BOT Road Project Borrower- OM Metal and Subash Projects Marketing Ltd.Punjab National Bank JaipurGRs. 318 Crores31-Dec-1969Ongoing
7Financial Management and Procurement Support Consultancy Services to SPMU under Coastal Zone Management Project in GujaratGujarat Ecology Commission Blcok-18, First Floor UdhyogBhavan, GandhingarA, B, C31-Dec-1969Ongoing
8Consultancy for Madurai – Tirunelveli – Panagudi – Kannyakumari Section (Km 0.00 to Km 240.40) of NH – 7 OMT – 6 (NS)National Highways Authority of India (NHAI)A, B, C, D31-Dec-1969Ongoing
9Consultancy for Chennai Bypass OMT – 15 (Others)National Highways Authority of India (NHAI)A, B, C, D31-Dec-1969Ongoing
10Consultancy for Vishakhapatnam Port (3.6 Km 4 Laned 8.57 Km 2 Laned) OMT – 22 (PC)National Highways Authority of India (NHAI)A, B, C, D31-Dec-1969Ongoing
11Lenders Independent Engineer for Jetpur -Somnath Road Project on BOT Borrower-IDFC Projects LtdG31-Dec-1969Ongoing
12Lenders Independent Engineer for Group Housing Society-“Cosmos Greens”Bhiwani Borrower-COSMOS Infra Engineering LtdPunjab National bankGRs. 30 Crores31-Dec-1969Ongoing
13Lenders Independent Engineer for Group Housing Society “Panchsheel Wellingtion”-Ghaziabad Borrower-Panchsheel Buildtech Pvt. LtdPunjab National bankGRs. 30 Crores31-Dec-1969Ongoing
14Project Management Consultants for Housing Project at BhubaneshwarCentral Government Employee Welfare Housing OrganizationB, CRs. 55 Crore31-Dec-1969Ongoing
15Consultancy for Hyderabad – Bangalore section ( km 211.00 to km 463.00) of NH – 7National Highways Authority of India (NHAI)A, B, C, DRs. 183.93 Crore31-Dec-1969Ongoing
16Consultancy for Jhansi – Orai (km 91.00 to km 220.00) of NH – 25National Highways Authority of India (NHAI)A, B, C, DRs. 103.56 Crore31-Dec-1969Ongoing
17Consultancy for Ayodhya – Gorakhpur Section (km 135.00 to km 251.7) of NH – 28National Highways Authority of India (NHAI)A, B, C, DRs. 90.78 Crore31-Dec-1969Ongoing
18Consultancy for Kanpur – Lucknow (km 11.05 to km 75.50) stretch of NH – 25, Lucknow Bypass (km 0.00 to km 22.85) stretch of NH – 56 and Lucknow – Anyodhya Section (km 8.0 to km 137) stretch of NH - 28National Highways Authority of India (NHAI)A, B, C, DRs. 177.60 CroresOngoing
194 Laning of Hasan-BC Road section of NH – 48 under plan – II in the State of KarnatakaNational Highways Authority of India (NHAI)A31-Dec-1969Ongoing
20Lenders Independent Engineer for Rama Hospitals, Engineering College, Medica College, MBA college Borrower-Rama Educational Society, 117/K137, Sarvodhya Nagar, Kanpur – 208 025Punjab National bankGRs. 1000 Crores31-Dec-1969Ongoing
21Lenders Independent Engineer for Group Housing Society- “Lotus Panache”, Noida Borrower- Ms Granite Gate Properties Pvt. Ltd. 93 B, Mittal Court, Nariman Point, Mumbai – 400021Punjab National BankGRs. 1026.36 Crores31-Dec-1969Jan-11
22Lenders Independent Engineer for Commercial Complex in Gurgaon Borrower-M/s D M TowersPunjab National BankGRs. 50 Crores31-Dec-1969Ongoing
23Consultancy Services for BOT Project Bina-Kurwai-Sironj Road Project – State of Madhya PradeshTelecommunication Consultants of India Limited , An Public Sector Undertaking of Government of IndiaB C DRs. 91.72 CroresOngoing
242 Laning of JHR / WB Border-Puruliya-Balrampur-JHR/WB Border Junction with NH – 33 at Chandil (Jharkhand) NH – 32 in the State of West Bengal under NHDP – IV BNational Highways Authority of India (NHAI)ARs. 420 CroresOngoing
252 Laning of Pundibari to Baxirhat section of NH – 31National Highways Authority of India (NHAI)ARs. 228 CroresOngoing
26Orissa – Anurang section from km 88/000 to km 239/000 of NH – 239 in the State of ChhattisgarhNational Highways Authority of India (NHAI)ARs. 1232 CroresOngoing
27Bareilly – Sitarganj section of NH – 74 section of NH – 56 for NHDP Phase – IV B & IV A in the State of Uttar Pradesh on PPP (DBFOT) PatternNational Highways Authority of India (NHAI)ARs. 456 CroresOngoing
28Lucknow-Sultanpur-Varanasi section of NH – 56 for NHDP Phase – IV B & IV A in the State of Uttar Pradesh on PPP (DBFOT) PatternNational Highways Authority of India (NHAI)ARs. 1013 CroresOngoing
29Kiratpur – Bilaspur of NH -21 in the State of Himachal Pradesh through PPP on DBFOT BasisNational Highways Authority of India (NHAI)AOngoing
30Moradabad-Aligarh of NH – 93 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT BasisNational Highways Authority of India (NHAI)ARs. 679 CroresOngoing
31Unnao – Lalganj section of NH – 93 from km 91.500 to km 156.000 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT BasisNational Highways Authority of India (NHAI)ARs. 533 CroresOngoing
32Etawah to Chakeri (Kanpur) section of NH – 2 from km 323.475 to km 483.687 in the State of Uttar Pradesh under NHDP Phase V on DBFOT BasisNational Highways Authority of India (NHAI)ARs. 1573 CroresOngoing
33Raipur – Dhamtari section from km 3.400 to 81.100 of NH – 43 in the State of Chhattisgarh on DBFOT Basis under NHDP Phase IVNational Highways Authority of India (NHAI)ARs. 330 CroresOngoing
344-laning of Meerut to Bulandshahar section from km 7469 to km 66+482 of NH – 235 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT BasisNational Highways Authority of India (NHAI)ARs. 508.57 CroresOngoing
35Padhi – Dahod Section of NH – 113 (Length 85.59 km) in the State of RajasthanNational Highways Authority of India (NHAI)ARs. 347.63 CroresOngoing
36Govindpur-Dhanbad-Bokaro-Ramgarh section of NH – 32 & NH – 33 in the State of Jharkhand under NHDP Phase IV BNational Highways Authority of India (NHAI)ARs. 265.00 CroresOngoing
37Govindpur-Chas to Jharkhand/West Bengal Border section of NH – 32 in the State of Jharkhand under NHDP Phase IV BNational Highways Authority of India (NHAI)ARs 271 CroresOngoing
38Four laning of Patiala-Sangrur-Bhatings section of NH – 64 from km 50.700 to 209.500 in the State of Punjab through Public Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.Punjab PWD, Government of PunjabARs. 1337 Crores.Ongoing
39Bina-Kurwai-Sironj on BOT/Annuity basis in the state of Madhya Pradesh.Telecommunication Consultants of India Limited , An Public Sector Undertaking of Government of IndiaFRs. 91.72 CroresOngoing
40Four Laning of Zirakpur – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public-Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.Punjab PWD, Government of PunjabERs. 460 CroresOngoing
41Four Laning of Zirakpur – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public-Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis.Punjab PWD, Government of PunjabARs. 460 croresOngoing
42Varanasi to Gorakhpur Section of NH – 29 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basisMinistry of Road Transport and Highways Government of IndiaARs. 535.00 croresMar’2010
43Kanpur to Kabrai Section of NH – 86 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basisMinistry of Road Transport and Highways Government of IndiaARs. 375.00 croresMar’2010
44Kollam to Kazhuthurutty Section of NH – 208 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT basisMinistry of Road Transport and Highways Government of IndiaARs. 193.00 croresMar’2010
45Agra to Aligarah Section of NH – 93 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.Ministry of Road Transport and Highways Government of IndiaARs. 235.00 croresMar’2010
46Raebareilly to Allahbad Section of NH – 24B in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.Ministry of Road Transport and Highways Government of IndiaARs. 290.00 croresMar’2010
47Aligarh to Kanpur section of NH – 91 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis.Ministry of Road Transport and Highways Government of IndiaARs. 720.00 croesMar’2010
48Kozhikode to Muthanga Section of NH – 212 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT Pattern.Ministry of Road Transport and Highways Government of IndiaARs. 365.00 coresMar’2010
49Kozhikode Kollegal Section of NH – 212 from Kerala Border to KollegalGovernment of KarnatakaARs. 373.00 croresFeb’2010
50Chitradurga-Shimoga Section of NH-13 in the state of KarnatakaGovernment of KarnatakaARs. 278.00 croresDec-09
514 laning of Cherthalai - Ochira of NH-47 on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs. 1286 Crores31-Dec-1969Ongoing
524 laning of Kuttipuram - Edapally of NH-17 on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs. 1158 crore31-Dec-1969Ongoing
534 laning of Ochira – Thiruvananathapuram of NH-47 on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs.1222 crore31-Dec-1969Ongoing
544 laning of Nagapatnam - Thanjavur of NH-67 on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs.619 Crores31-Dec-1969Ongoing
554 laning of Udampur - Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase –IINational Highways Authority of India (NHAI)AYet to be determined31-Dec-1969Ongoing
564 laning of Banihal - Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase –IINational Highways Authority of India (NHAI)AYet to Determine31-Dec-1969Ongoing
57Four Laning of PATNA - BAKHTIYARPUR section of NH- 30 in the state of Bihar on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III.National Highways Authority of India (NHAI)ARs 600.54 Crores31-Dec-1969Ongoing
58Four/ Six Laning of GANDHIDHAM (KANDLA) - MUNDRA section of NH - 8A in the state of Gujarat on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III - BOT (Toll) basis.National Highways Authority of India (NHAI)ARs. 953.88 Crores31-Dec-1969Concession Agreement Signed
596 laning of Varanasi-Aurangabad of NH-2 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –VNational Highways Authority of India (NHAI)ARs 2848 Crores31-Dec-1969Concession Agreement Signed
602 laning of paved shoulder of Mokama- Munger section of NH – 80 from km. 1.430 to km 70.00 in the State of BiharNational Highways Authority of India (NHAI)ARs 351.54 Crores31-Dec-1969Concession Agreement Signed
614-laning of Bareilly-Sitapur Section of NH-24 in the State of Uttar Pradesh on DBFOT basis under NHDP – IIINational Highways Authority of India (NHAI)ARs.1048 Crores31-Dec-1969Concession Agreement Signed
624 laning of Goa – Karnataka Border to Panaji - Goa of NH-4A on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs. 471.00 Crores31-Dec-1969Concession Agreement Signed
634 laning of Jammu - Udhampur of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –IINational Highways Authority of India (NHAI)AYet to determined31-Dec-1969Concession Agreement Signed
644-laning of Rohtak-Panipat Section of NH-71A in the State of Haryana on DBFOT basis under NHDP - IIINational Highways Authority of India (NHAI)ARs.812.2 Crores31-Dec-1969Concession Agreement Signed
654 laning of Talegaon - Amravati of NH-6 on BOT project on DBFOT Pattern under NHDP Phase –IIINational Highways Authority of India (NHAI)ARs.567 Crores31-Dec-1969Concession Agreement Signed
66Four Laning of BEAWAR - PALI section of NH – 14 in the state of Rajasthan on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-IIINational Highways Authority of India (NHAI)ARs.1102 Crores31-Dec-1969Sep-10
676 laning of Belgaum - Dharwad of NH-4 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –VNational Highways Authority of India (NHAI)ARs. 480.00 Crores31-Dec-1969Concession Agreement Signed
684 laning of Chenani - Nashri of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –IINational Highways Authority of India (NHAI)ARs. 2519.00 Crores31-Dec-1969Concession Agreement Signed
696 laning of Indore - Dewas of NH-3 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –VNational Highways Authority of India (NHAI)ARs.410 Crores31-Dec-1969Concession Agreement Signed
70Four Laning of PALI - PINDWARA section of NH – 14 in the state of Rajasthan on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-IIINational Highways Authority of India (NHAI)ARs.1307 Crores31-Dec-1969Concession Agreement Signed
71Six Laning of TUMKUR - CHITRADURGA section of NH - 4 in the state of Karnataka on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-VNational Highways Authority of India (NHAI)ARs.839 Crores31-Dec-1969Concession Agreement Signed
72Techno- Financial Consultancy for Evaluation of applications of concessionaires received for pre scoring of their technical and financial capabilities for the projects of 2 laning with paved shoulders on PPPMinistry of Road Transport & Highways , Government of IndiaAVaries31-Dec-1969Dec-09
7324 Border Check Posts across the state on BOT basis on Design, Built, Finance, Operate & Transfer (DBFOT) modelSMS Infrastructure Ltd- KazStroy Service Infrastructure India Ltd – Visesh Infotecnics Ltd (Consortium)FRs. 1094 CroresDec-10
74Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar –PIU-I (PMGSY Phase-VIII) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar, Madhya Pradesh, IndiaB C DRs. 13.07 Crores31-Dec-1969Dec-10
75Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –I (PMGSY Phase IX) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar, Madhya Pradesh, IndiaB C DRs. 5.23 Crores31-Dec-1969Dec-10
76Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar PIU – III (PMGSY Phase-VI) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar, Madhya Pradesh, IndiaB C DRs. 3.05 Crores31-Dec-1969
77Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –III ( PMGSY Phase-V) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar, Madhya Pradesh, IndiaB C DRs. 2.40 Crores31-Dec-1969Dec-10
78Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar ( Batch –III ADB), Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar, Madhya Pradesh, IndiaB C DRs. 13.19 Crores31-Dec-1969Dec-10
79Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU – III (PMGSY Phase-VIII) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar , Madhya Pradesh, IndiaB C DRs.13.63 Crores31-Dec-1969Dec-10
80Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –IV ( PNGSY Phase-VI) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar , Madhya Pradesh, IndiaB C DRs. 3.71 Crores31-Dec-1969Dec-10
81Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar (PMGSY Phase-VIII) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Dhar , Madhya Pradesh, IndiaB C DRs. 19.85 Crores31-Dec-1969Dec-10
82Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( ADB Batch –3) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs. 17.95 Crores31-Dec-1969
83Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-IX) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs. 8.64 Crores31-Dec-1969Jul-09
84Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-V) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs. 5.22 Crores31-Dec-1969Jul-09
85Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-VI) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs.17.98 Crores31-Dec-1969
86Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-VIII) Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs.5.65 Crores31-Dec-1969
87Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( State Connectivity ) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Agar , Madhya Pradesh, IndiaB C DRs. 1.01 Crores31-Dec-1969Jul-09
88Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria ( PMGSY Phase-IV) , Madhya Pradesh, IndiaMP Rural Road Development Authority (MPRRDA) Umaria, Madhya Pradesh, IndiaB C DRs. 4.91 Crores31-Dec-1969Jul-09
89Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria ( Phase Phase-VI) , Madhya Pradesh, India (Phase –IV)MP Rural Road Development Authority (MPRRDA) Umaria, Madhya Pradesh, IndiaB C DRs. 15.35 Crores31-Dec-1969Jul-09
90Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria (PMGSY Phase-VIII) , Madhya Pradesh, India (Phase –IV)MP Rural Road Development Authority (MPRRDA) Umaria, Madhya Pradesh, IndiaB C DRs. 15.67 Crores31-Dec-1969Jul-09
91Consultancy for Review & Preparation of As-Built Drawings for Bina – Sironj - Guna (144 Km) State HighwayTelecommunication Consultants of India Limited , An Public Sector Undertaking of Government of IndiaBRs.44 Crores31-Dec-1969Aug-08
92Technical & Financial Assistance in finalisation of PPPAC proposal for Cuttack – Angul Road ProjectMinistry of Road Transport and Highways Government of IndiaF