| S. No. |
Name of Project |
Client Info. |
Assignment |
Cost of Project |
Start Date |
End Date |
|
1 | Independent Engineer for 24 Border Check Post Project on BOT Basis in Madhya Pradesh – Jointly with Bloom LLC. | Madhya Pradesh Road Development Corporation,Bhopal (M.P.) | Independent Engineer Services | Rs. 1094 Crores | 31-Dec-1969 | Ongoing |
|
2 | Consultancy for Operation and Maintenance of Haldia Port OMT – 17 (PC) | National Highways Authority of India (NHAI) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
3 | Consultancy for Operation and Maintenance for Srinagar Bypass (Road Portion) (NS – 30) Srinagar Bypass (Bridge Portion) (NH – 30 A) km 286 to km 303.8 | National Highways Authority of India (NHAI) OMT – 31 (NS) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
4 | Consultancy for Lalitpur-Sagar-Lakhnadone Section of NH – 7 OMT – 14 (NS) | National Highways Authority of India (NHAI) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
5 | Lenders Engineer for Valuation of Machinery
Borrower-M/s OPC Technology Japan Pvt. Ltd. | Punjab National Bank | G | | 31-Dec-1969 | Ongoing |
|
6 | Lenders Independent Engineer for JAIPUR – BHILWARA BOT Road Project
Borrower- OM Metal and Subash Projects Marketing Ltd. | Punjab National Bank
Jaipur | G | Rs. 318 Crores | 31-Dec-1969 | Ongoing |
|
7 | Financial Management and Procurement Support Consultancy Services to SPMU under Coastal Zone Management Project in Gujarat | Gujarat Ecology Commission
Blcok-18, First Floor
UdhyogBhavan, Gandhingar | A, B, C | | 31-Dec-1969 | Ongoing |
|
8 | Consultancy for Madurai – Tirunelveli – Panagudi – Kannyakumari Section (Km 0.00 to Km 240.40) of NH – 7
OMT – 6 (NS) | National Highways Authority of India (NHAI) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
9 | Consultancy for Chennai Bypass OMT – 15 (Others) | National Highways Authority of India (NHAI) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
10 | Consultancy for Vishakhapatnam Port (3.6 Km 4 Laned 8.57 Km 2 Laned) OMT – 22 (PC) | National Highways Authority of India (NHAI) | A, B, C, D | | 31-Dec-1969 | Ongoing |
|
11 | Lenders Independent Engineer for Jetpur -Somnath Road Project on BOT Borrower- | IDFC Projects Ltd | G | | 31-Dec-1969 | Ongoing |
|
12 | Lenders Independent Engineer for Group Housing Society-“Cosmos Greens”Bhiwani
Borrower-COSMOS Infra Engineering Ltd | Punjab National bank | G | Rs. 30 Crores | 31-Dec-1969 | Ongoing |
|
13 | Lenders Independent Engineer for Group Housing Society “Panchsheel Wellingtion”-Ghaziabad
Borrower-Panchsheel Buildtech Pvt. Ltd | Punjab National bank | G | Rs. 30 Crores | 31-Dec-1969 | Ongoing |
|
14 | Project Management Consultants for Housing Project at Bhubaneshwar | Central Government Employee Welfare Housing Organization | B, C | Rs. 55 Crore | 31-Dec-1969 | Ongoing |
|
15 | Consultancy for Hyderabad – Bangalore section ( km 211.00 to km 463.00) of NH – 7 | National Highways Authority of India (NHAI) | A, B, C, D | Rs. 183.93 Crore | 31-Dec-1969 | Ongoing |
|
16 | Consultancy for Jhansi – Orai (km 91.00 to km 220.00) of NH – 25 | National Highways Authority of India (NHAI) | A, B, C, D | Rs. 103.56 Crore | 31-Dec-1969 | Ongoing |
|
17 | Consultancy for Ayodhya – Gorakhpur Section (km 135.00 to km 251.7) of NH – 28 | National Highways Authority of India (NHAI) | A, B, C, D | Rs. 90.78 Crore | 31-Dec-1969 | Ongoing |
|
18 | Consultancy for Kanpur – Lucknow (km 11.05 to km 75.50) stretch of NH – 25, Lucknow Bypass (km 0.00 to km 22.85) stretch of NH – 56 and Lucknow – Anyodhya Section (km 8.0 to km 137) stretch of NH - 28 | National Highways Authority of India (NHAI) | A, B, C, D | Rs. 177.60 Crores | | Ongoing |
|
19 | 4 Laning of Hasan-BC Road section of NH – 48 under plan – II in the State of Karnataka | National Highways Authority of India (NHAI) | A | | 31-Dec-1969 | Ongoing |
|
20 | Lenders Independent Engineer for Rama Hospitals, Engineering College, Medica College, MBA college
Borrower-Rama Educational Society,
117/K137, Sarvodhya Nagar,
Kanpur – 208 025 | Punjab National bank | G | Rs. 1000 Crores | 31-Dec-1969 | Ongoing |
|
21 | Lenders Independent Engineer for Group Housing Society- “Lotus Panache”, Noida
Borrower- Ms Granite Gate Properties Pvt. Ltd.
93 B, Mittal Court, Nariman Point,
Mumbai – 400021 | Punjab National Bank | G | Rs. 1026.36 Crores | 31-Dec-1969 | Jan-11 |
|
22 | Lenders Independent Engineer for Commercial Complex in Gurgaon
Borrower-M/s D M Towers | Punjab National Bank | G | Rs. 50 Crores | 31-Dec-1969 | Ongoing |
|
23 | Consultancy Services for BOT Project Bina-Kurwai-Sironj Road Project – State of Madhya Pradesh | Telecommunication Consultants of India Limited , An Public Sector Undertaking of Government of India | B C D | Rs. 91.72 Crores | | Ongoing |
|
24 | 2 Laning of JHR / WB Border-Puruliya-Balrampur-JHR/WB Border Junction with NH – 33 at Chandil (Jharkhand) NH – 32 in the State of West Bengal under NHDP – IV B | National Highways Authority of India (NHAI) | A | Rs. 420 Crores | | Ongoing |
|
25 | 2 Laning of Pundibari to Baxirhat section of NH – 31 | National Highways Authority of India (NHAI) | A | Rs. 228 Crores | | Ongoing |
|
26 | Orissa – Anurang section from km 88/000 to km 239/000 of NH – 239 in the State of Chhattisgarh | National Highways Authority of India (NHAI) | A | Rs. 1232 Crores | | Ongoing |
|
27 | Bareilly – Sitarganj section of NH – 74 section of NH – 56 for NHDP Phase – IV B & IV A in the State of Uttar Pradesh on PPP (DBFOT) Pattern | National Highways Authority of India (NHAI) | A | Rs. 456 Crores | | Ongoing |
|
28 | Lucknow-Sultanpur-Varanasi section of NH – 56 for NHDP Phase – IV B & IV A in the State of Uttar Pradesh on PPP (DBFOT) Pattern | National Highways Authority of India (NHAI) | A | Rs. 1013 Crores | | Ongoing |
|
29 | Kiratpur – Bilaspur of NH -21 in the State of Himachal Pradesh through PPP on DBFOT Basis | National Highways Authority of India (NHAI) | A | | | Ongoing |
|
30 | Moradabad-Aligarh of NH – 93 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT Basis | National Highways Authority of India (NHAI) | A | Rs. 679 Crores | | Ongoing |
|
31 | Unnao – Lalganj section of NH – 93 from km 91.500 to km 156.000 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT Basis | National Highways Authority of India (NHAI) | A | Rs. 533 Crores | | Ongoing |
|
32 | Etawah to Chakeri (Kanpur) section of NH – 2 from km 323.475 to km 483.687 in the State of Uttar Pradesh under NHDP Phase V on DBFOT Basis | National Highways Authority of India (NHAI) | A | Rs. 1573 Crores | | Ongoing |
|
33 | Raipur – Dhamtari section from km 3.400 to 81.100 of NH – 43 in the State of Chhattisgarh on DBFOT Basis under NHDP Phase IV | National Highways Authority of India (NHAI) | A | Rs. 330 Crores | | Ongoing |
|
34 | 4-laning of Meerut to Bulandshahar section from km 7469 to km 66+482 of NH – 235 in the State of Uttar Pradesh under NHDP Phase IV B on DBFOT Basis | National Highways Authority of India (NHAI) | A | Rs. 508.57 Crores | | Ongoing |
|
35 | Padhi – Dahod Section of NH – 113 (Length 85.59 km) in the State of Rajasthan | National Highways Authority of India (NHAI) | A | Rs. 347.63 Crores | | Ongoing |
|
36 | Govindpur-Dhanbad-Bokaro-Ramgarh section of NH – 32 & NH – 33 in the State of Jharkhand under NHDP Phase IV B | National Highways Authority of India (NHAI) | A | Rs. 265.00 Crores | | Ongoing |
|
37 | Govindpur-Chas to Jharkhand/West Bengal Border section of NH – 32 in the State of Jharkhand under NHDP Phase IV B | National Highways Authority of India (NHAI) | A | Rs 271 Crores | | Ongoing |
|
38 | Four laning of Patiala-Sangrur-Bhatings section of NH – 64 from km 50.700 to 209.500 in the State of Punjab through Public Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis. | Punjab PWD, Government of Punjab | A | Rs. 1337 Crores. | | Ongoing |
|
39 | Bina-Kurwai-Sironj on BOT/Annuity basis in the state of Madhya Pradesh. | Telecommunication Consultants of India Limited , An Public Sector Undertaking of Government of India | F | Rs. 91.72 Crores | | Ongoing |
|
40 | Four Laning of Zirakpur – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public-Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis. | Punjab PWD, Government of Punjab | E | Rs. 460 Crores | | Ongoing |
|
41 | Four Laning of Zirakpur – Patiala Section of NH-64 from Km 0.000 to Km 50.700 in the State of Punjab through Public-Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis. | Punjab PWD, Government of Punjab | A | Rs. 460 crores | | Ongoing |
|
42 | Varanasi to Gorakhpur Section of NH – 29 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis | Ministry of Road Transport and Highways Government of India | A | Rs. 535.00 crores | | Mar’2010 |
|
43 | Kanpur to Kabrai Section of NH – 86 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis | Ministry of Road Transport and Highways Government of India | A | Rs. 375.00 crores | | Mar’2010 |
|
44 | Kollam to Kazhuthurutty Section of NH – 208 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT basis | Ministry of Road Transport and Highways Government of India | A | Rs. 193.00 crores | | Mar’2010 |
|
45 | Agra to Aligarah Section of NH – 93 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis. | Ministry of Road Transport and Highways Government of India | A | Rs. 235.00 crores | | Mar’2010 |
|
46 | Raebareilly to Allahbad Section of NH – 24B in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis. | Ministry of Road Transport and Highways Government of India | A | Rs. 290.00 crores | | Mar’2010 |
|
47 | Aligarh to Kanpur section of NH – 91 in the state of Uttar Pradesh of two lane with paved shoulders through “PPP” on DBFOT basis. | Ministry of Road Transport and Highways Government of India | A | Rs. 720.00 croes | | Mar’2010 |
|
48 | Kozhikode to Muthanga Section of NH – 212 in the state of Kerala of two lane with paved shoulders through “PPP” on DBFOT Pattern. | Ministry of Road Transport and Highways Government of India | A | Rs. 365.00 cores | | Mar’2010 |
|
49 | Kozhikode Kollegal Section of NH – 212 from Kerala Border to Kollegal | Government of Karnataka | A | Rs. 373.00 crores | | Feb’2010 |
|
50 | Chitradurga-Shimoga Section of NH-13 in the state of Karnataka | Government of Karnataka | A | Rs. 278.00 crores | | Dec-09 |
|
51 | 4 laning of Cherthalai - Ochira of NH-47 on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs. 1286 Crores | 31-Dec-1969 | Ongoing |
|
52 | 4 laning of Kuttipuram - Edapally of NH-17 on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs. 1158 crore | 31-Dec-1969 | Ongoing |
|
53 | 4 laning of Ochira – Thiruvananathapuram of NH-47 on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs.1222 crore | 31-Dec-1969 | Ongoing |
|
54 | 4 laning of Nagapatnam - Thanjavur of NH-67 on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs.619 Crores | 31-Dec-1969 | Ongoing |
|
55 | 4 laning of Udampur - Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II | National Highways Authority of India (NHAI) | A | Yet to be determined | 31-Dec-1969 | Ongoing |
|
56 | 4 laning of Banihal - Ramban of NH-1 on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II | National Highways Authority of India (NHAI) | A | Yet to Determine | 31-Dec-1969 | Ongoing |
|
57 | Four Laning of PATNA - BAKHTIYARPUR section of NH- 30 in the state of Bihar on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III. | National Highways Authority of India (NHAI) | A | Rs 600.54 Crores | 31-Dec-1969 | Ongoing |
|
58 | Four/ Six Laning of GANDHIDHAM (KANDLA) - MUNDRA section of NH - 8A in the state of Gujarat on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III - BOT (Toll) basis. | National Highways Authority of India (NHAI) | A | Rs. 953.88 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
59 | 6 laning of Varanasi-Aurangabad of NH-2 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V | National Highways Authority of India (NHAI) | A | Rs 2848 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
60 | 2 laning of paved shoulder of Mokama- Munger section of NH – 80 from km. 1.430 to km 70.00 in the State of Bihar | National Highways Authority of India (NHAI) | A | Rs 351.54 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
61 | 4-laning of Bareilly-Sitapur Section of NH-24 in the State of Uttar Pradesh on DBFOT basis under NHDP – III | National Highways Authority of India (NHAI) | A | Rs.1048 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
62 | 4 laning of Goa – Karnataka Border to Panaji - Goa of NH-4A on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs. 471.00 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
63 | 4 laning of Jammu - Udhampur of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II | National Highways Authority of India (NHAI) | A | Yet to determined | 31-Dec-1969 | Concession Agreement Signed |
|
64 | 4-laning of Rohtak-Panipat Section of NH-71A in the State of Haryana on DBFOT basis under NHDP - III | National Highways Authority of India (NHAI) | A | Rs.812.2 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
65 | 4 laning of Talegaon - Amravati of NH-6 on BOT project on DBFOT Pattern under NHDP Phase –III | National Highways Authority of India (NHAI) | A | Rs.567 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
66 | Four Laning of BEAWAR - PALI section of NH – 14 in the state of Rajasthan on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III | National Highways Authority of India (NHAI) | A | Rs.1102 Crores | 31-Dec-1969 | Sep-10 |
|
67 | 6 laning of Belgaum - Dharwad of NH-4 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V | National Highways Authority of India (NHAI) | A | Rs. 480.00 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
68 | 4 laning of Chenani - Nashri of NH-1A on BOT (Annuity) project on DBFO Pattern under NHDP Phase –II | National Highways Authority of India (NHAI) | A | Rs. 2519.00 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
69 | 6 laning of Indore - Dewas of NH-3 on BOT ( Toll) project on DBFO Pattern under NHDP Phase –V | National Highways Authority of India (NHAI) | A | Rs.410 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
70 | Four Laning of PALI - PINDWARA section of NH – 14 in the state of Rajasthan on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-III | National Highways Authority of India (NHAI) | A | Rs.1307 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
71 | Six Laning of TUMKUR - CHITRADURGA section of NH - 4 in the state of Karnataka on Design, Build, Finance, Operate and Transfer (“DBFOT”) Basis Under NHDP-V | National Highways Authority of India (NHAI) | A | Rs.839 Crores | 31-Dec-1969 | Concession Agreement Signed |
|
72 | Techno- Financial Consultancy for Evaluation of applications of concessionaires received for pre scoring of their technical and financial capabilities for the projects of 2 laning with paved shoulders on PPP | Ministry of Road Transport & Highways , Government of India | A | Varies | 31-Dec-1969 | Dec-09 |
|
73 | 24 Border Check Posts across the state on BOT basis on Design, Built, Finance, Operate & Transfer (DBFOT) model | SMS Infrastructure Ltd- KazStroy Service Infrastructure India Ltd – Visesh Infotecnics Ltd (Consortium) | F | Rs. 1094 Crores | | Dec-10 |
|
74 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar –PIU-I (PMGSY Phase-VIII) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar, Madhya Pradesh, India | B C D | Rs. 13.07 Crores | 31-Dec-1969 | Dec-10 |
|
75 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –I (PMGSY Phase IX) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar, Madhya Pradesh, India | B C D | Rs. 5.23 Crores | 31-Dec-1969 | Dec-10 |
|
76 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar PIU – III (PMGSY Phase-VI) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar, Madhya Pradesh, India | B C D | Rs. 3.05 Crores | 31-Dec-1969 | |
|
77 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –III ( PMGSY Phase-V) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar, Madhya Pradesh, India | B C D | Rs. 2.40 Crores | 31-Dec-1969 | Dec-10 |
|
78 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar ( Batch –III ADB), Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar, Madhya Pradesh, India | B C D | Rs. 13.19 Crores | 31-Dec-1969 | Dec-10 |
|
79 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU – III (PMGSY Phase-VIII) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar , Madhya Pradesh, India | B C D | Rs.13.63 Crores | 31-Dec-1969 | Dec-10 |
|
80 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar – PIU –IV ( PNGSY Phase-VI) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar , Madhya Pradesh, India | B C D | Rs. 3.71 Crores | 31-Dec-1969 | Dec-10 |
|
81 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Dhar (PMGSY Phase-VIII) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Dhar , Madhya Pradesh, India | B C D | Rs. 19.85 Crores | 31-Dec-1969 | Dec-10 |
|
82 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( ADB Batch –3) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs. 17.95 Crores | 31-Dec-1969 | |
|
83 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-IX) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs. 8.64 Crores | 31-Dec-1969 | Jul-09 |
|
84 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-V) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs. 5.22 Crores | 31-Dec-1969 | Jul-09 |
|
85 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-VI) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs.17.98 Crores | 31-Dec-1969 | |
|
86 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( PMGSY Phase-VIII) Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs.5.65 Crores | 31-Dec-1969 | |
|
87 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Agar ( State Connectivity ) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Agar , Madhya Pradesh, India | B C D | Rs. 1.01 Crores | 31-Dec-1969 | Jul-09 |
|
88 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria ( PMGSY Phase-IV) , Madhya Pradesh, India | MP Rural Road Development Authority (MPRRDA)
Umaria, Madhya Pradesh, India | B C D | Rs. 4.91 Crores | 31-Dec-1969 | Jul-09 |
|
89 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria ( Phase Phase-VI) , Madhya Pradesh, India (Phase –IV) | MP Rural Road Development Authority (MPRRDA)
Umaria, Madhya Pradesh, India | B C D | Rs. 15.35 Crores | 31-Dec-1969 | Jul-09 |
|
90 | Supervision & Quality Control Consultancy for Construction and Up gradation Of Rural Roads in Umaria (PMGSY Phase-VIII) , Madhya Pradesh, India (Phase –IV) | MP Rural Road Development Authority (MPRRDA)
Umaria, Madhya Pradesh, India | B C D | Rs. 15.67 Crores | 31-Dec-1969 | Jul-09 |
|
91 | Consultancy for Review & Preparation of As-Built Drawings for Bina – Sironj - Guna (144 Km) State Highway | Telecommunication Consultants of India Limited , An Public Sector Undertaking of Government of India | B | Rs.44 Crores | 31-Dec-1969 | Aug-08 |
|
92 | Technical & Financial Assistance in finalisation of PPPAC proposal for Cuttack – Angul Road Project | Ministry of Road Transport and Highways Government of India | F | | | |